one of the work stations the main theme has been done with light coloured wood grain laminate with colourful accents  in the partitions and ceiling. the entrance. the stainless steel panel is to take the company logo. view from the entrance. the corridor past the executive cabins. the common discussion table. the full glass wall of the executive cabins. the wall of the boardroom on the ground floor. another view of the board room. the reception desk on the ground floor and the curved stair leading up. detail of the reception desk. view up the stair another view of the interior. wood grain laminate used with coloured elements in the work stations.
R & D Block for Fenner India Pvt. Ltd.
Sriperumbudur, Chennai
This facility is located inside the SIDCO Industrial Estate at Sriperumbudur near Chennai. The separate R & D block is on two floors with the main work area on the first floor covering an area of 5000 square feet. It has 30 work station cubicles, besides four large cabins for the senior executives and five open cabins for junior executives. It also has two laboratories and meeting areas. On the ground floor it has a 16 seater conference room and a smaller discussion room and also the reception and waiting areas. The project was completed in January 2008.